Cn Section F Construction
NIC 2025 MoSPI source

NIC 431203 - Clearing of building sites, earth moving: excavation, landfill, levelling and grading of construction sites, trench digging, rock removal, blasting etc.

NIC 431203 classifies clearing of building sites, earth moving: excavation, landfill, levelling and grading of construction sites, trench digging, rock removal, blasting etc. as a final six-digit construction activity...

Level Sub-class
Depth 5/5
Children 0
Last verified 2026-04-21

In this section

Official note

Class 4312 note from source layer

This class includes the preparation of sites for subsequent construction activities. This class excludes: - drilling of production oil or gas wells, see 0610, 0620 - test drilling and test hole boring for mining operations (other than oil and gas extraction), see 0990 - decontamination of soil, see 3900 - water well drilling, see 4220 - shaft sinking, see 4390 - oil and gas field exploration, geophysical, geological and seismic surveying, see 7110

NIC 2008 -> NIC 2025 Mapping for 431203

NIC 2008 links are discovery matches from the local converter layer. Verify final migration decisions against official source documents.

NIC 2008 43123 high

Clearing of building sites, earth moving: excavation, landfill, levelling and grading of construction sites, trench digging, rock removal, blasting etc.

NIC 2008 43122 low

Site preparation including drilling, boring and core sampling for construction, geophysical, geological or similar purposes